Rasmus Suonio
ResearchInvestment memo

FTAI Aviation: the share price already pays for the Street’s plan

The cash flows, the shrinking CFM56 fleet and the FTAI Power evidence all point to a smaller plan. Short at $167.03, moderate conviction.

FTAIFTAI Aviation Ltd. · NASDAQ
Short
Price, 2 Oct 2026
$167.03
Base-case value (DCF)
$120 −28%
Probability-weighted
$138 −17%
Horizon
12 months
Conviction
Moderate
Scenario values against the price
Price $167.03
Bear$42 · 30%
Base$120 · 50%
Bull$328 · 20%

The call. We are short FTAI. On our cash-flow DCF the base case is worth $120 a share (−28%). Weighting the bear, base and bull cases 30/50/20 gives $138 (−17%). The 12-month probability-weighted value, accreting at the cost of equity, is $152 (−9% before the ~1.2% dividend).

The Street sees +86–116% upside: September targets are $310–360, and all but two of the 10–11 covering analysts rate the stock Buy. That view needs management’s $2.3B 2027 plan, including $450M from a Power business that has not delivered a unit, and a 16.5–18x multiple on earnings that convert poorly to cash. The independent evidence points the other way: an old engine fleet flying 6–8% less each year, GAAP operating cash flow negative in 6 of the last 8 quarters, and gains on a shrinking leasing book worth about a third of Adjusted EBITDA. The risk is a fat right tail: our bull case ($328, +96%) is real if Power works at scale.

Key numbers
Price (2 October 2026) $167.03 52-week range $149.50–$323.51
Market cap / EV $17.4B / $20.6B Net debt + preferred (Jun-26) $3.22B
Adj. EBITDA 2027E: ours / consensus 1,912 / 2,181 EV / 2027E EBITDA: ours / consensus 10.8x / 9.4x
Unlevered FCF 2027E (after stock comp) 692 EV / 2027E unlevered FCF 29.8x
Bear / base / bull value $42 / $120 / $328 Street targets (MS / JEF / BARC) $360 / $325 / $310

Prices: CFRA (close 2 Oct 2026). Broker views: Barclays, Jefferies and Morgan Stanley notes. This memo combines three bodies of work: an alternative-data study of FTAI's markets, a study of the evidence on FTAI Power, and an earlier FTAI stock report. It adds a new four-scenario quarterly model and valuation.

All forecasts are scenario arithmetic on labelled assumptions; several key FTAI Power inputs are not disclosed by any party and are analyst estimates.

1. Recommendation summary #

The thesis in five points #

  1. The price already discounts consensus, and consensus is too high.
    • Run through our cash-flow DCF, the Street’s numbers (2027E Adj. EBITDA ~$2.2B, 2028E ~$2.9B) are worth $193 (+15%), close to today’s price.
    • Our evidence-based base case is −12% below consensus in 2027 (1,912 vs 2,181) and −18% below in 2028 (2,338 vs 2,868).
    • Most of the 2027 gap is FTAI Power: our base is $214M against the $450M guide. The dedicated Power study’s base is $440M on the same ~$7–8M of EBITDA per turbine; the difference is 2027 volume (45 vs 61 turbines) and opex, and the evidence on production leans to the lower figure.
    • After 2027 the gap is also module growth, which needs share gains in a CFM56 shop-visit market that the OEMs see flat to 2028 and falling after.
  2. EBITDA is not cash.
    • GAAP operating cash flow was −$188M in 2024, −$311M in 2025 and −$265M in H1’26, while Adjusted EBITDA reached $1.19B (2025).
    • The gap was funded by selling the leasing book: $1.71B of proceeds in 2025 and $0.79B in H1’26. That book has fallen from $2.37B to $1.15B in 18 months.
    • About a third of Adjusted EBITDA has equalled gains on those asset sales.
    • Another $219M (2027E) is FTAI’s non-cash share of its funds’ and JV’s EBITDA.
    • Our base-case unlevered FCF after stock comp is $692M in 2027 against $1,912M of EBITDA (36% conversion), rising to 61% by 2030.
  3. The core market is ageing in plain sight.
    • US carriers flew their 737NG fleet 6.5% fewer hours and their A320ceo family 7.5% fewer in H1’26 (BTS T-100). The CFM56/V2500 share of US narrowbody hours is 64% (Jun-26), against 97% in 2019.
    • Repair dollars still rise (+18% y/y) because the fleet is older. That supports 2026–27 volumes, but it is a pool that shrinks after 2028.
    • FTAI’s Aerospace margin has fallen ~10 points in two years, and the 40% target set in February was withdrawn in July.
  4. FTAI Power is real, but FTAI does not control it.
    • The $1.465B order belongs to J&F Power Systems, which Jereh consolidates.
    • Units, transfer price, JV share and customer are all undisclosed.
    • First delivery has slipped from “by Q4 2026” to 2027.
    • Executive Order 14421 lists generation turbines, and DOE rules are due ~24 Dec.
    • The closest comparable (Boom’s 1.21 GW order from Crusoe) was cancelled on 25 Sep.
  5. Disclosure and governance add to the discount, not subtract from it.
    • 20–30% of Aerospace revenue is sold to a fund FTAI manages and part-owns, in which executives hold carried interest.
    • Two 2026 guidance items have already been contradicted (40% AP margin; $575M Leasing).
    • None of the Power JV, the order or EO 14421 appears in the 10-Q.
    • The CFO resigned in March. Insiders sold ~$64.6M and bought ~$3.3M since 2025.

What the price implies #

Holding everything else at our base case, $167 needs one of the following:

  • terminal growth of 4.4% after 2035, for a CFM56-centred business;
  • a 7.9% WACC, against a 1.57 regression beta;
  • 177 Power turbines in 2028 (~202 by 2030; base 70/80);
  • an Aerospace EBITDA margin of 40.7%;
  • 2,432 modules in 2028 (base 1,700).

None of these is impossible on its own. The Street case needs several at once.

Why now: the next 90 days #

  • Q3’26 results (late Oct – early Nov).
    • Our base Adj. EBITDA is $316M, against $332M consensus and $302M at Jefferies.
    • We watch for a GAAP cash-flow turn, inventory below $1.7B, and the first disclosure of the J&F stake.
  • DOE rules under EO 14421 (~24 Dec). A binary event for the Power narrative.
  • First Mod-1 customer delivery (early 2027). A miss pushes 2027 Power units well below 60.

What would make us wrong (and flip us to long) #

  • A second Power order from a customer independent of Jereh, with disclosed units and economics.
  • On-time commissioning with published output, heat rate and NOx.
  • DOE excluding behind-the-meter gensets.
  • Aerospace margin back above ~32% with module growth above 1,700 in 2027.
  • GAAP operating cash flow turning sustainably positive without relying on asset sales.

Any two of these together would move our probability weights toward the bull case. The bull probability that makes the expected value equal to the price is 32%, against our 20%.

[!warn] Risks to the short. The stock is already down 48% from its high, and all but two of the 10–11 covering analysts rate it Buy. Short interest is 5.9% of float (4.4 days to cover). A $500M buyback is authorised. The bull case is +96%. Shorts in this name face sharp squeezes on Power headlines. The right tail is the reason conviction is moderate rather than high.

2. Valuation at a glance #

Valuation summary. DCF ranges flex WACC by one point; SOTP ranges use low/mid/high segment multiples on 2027E; Street references from broker notes and CFRA. The dashed line is the 2 Oct 2026 close.
Valuation summary. DCF ranges flex WACC by one point; SOTP ranges use low/mid/high segment multiples on 2027E; Street references from broker notes and CFRA. The dashed line is the 2 Oct 2026 close.
Scenario Prob. Adj. EBITDA 27E 28E 30E Power 27E UFCF 27E EV / 27E EBITDA Value / share vs price
Bear 30% 1,252 1,354 1,336 −118 437 6.0x $42 −75%
Base 50% 1,912 2,338 2,537 214 724 8.1x $120 −28%
Bull 20% 3,017 4,053 4,790 900 1,094 12.1x $328 +96%
Street (reference) – 2,214 2,919 3,468 449 847 10.3x $193 +15%
Probability-weighted 100% $138 −17%

Values per share as of the price date (6/30/26 balance sheet rolled forward at the cost of equity, less the Q3 dividend). UFCF = CFO + after-tax interest + CFI; the 2027E column is before stock comp, while the DCF deducts it. The "Street" case is a reference calibrated to consensus EBITDA and is not in the weights.

Scenario values (DCF): bubble size shows probability; the diamond is the probability-weighted value.
Scenario values (DCF): bubble size shows probability; the diamond is the probability-weighted value.

How to read the valuation. Three lenses give three answers. The gaps between them are the investment debate.

Lens What it says Our read
Cash-flow DCF (primary) Base $120, probability-weighted $138 FTAI is worth less than the price unless 2027–28 beats consensus
Peer multiples on our numbers (SOTP, 2027E) $138–$212, mid $173 Roughly fair at MRO-type multiples (9–12x). The price gives the base case a full MRO multiple
Street method (consensus EBITDA x 16.5–18x) $310–360 Needs the plan delivered and parts/OEM multiples on EBITDA that includes non-cash and gain components

Why we put the DCF first:

  • FTAI’s Adjusted EBITDA contains items a multiple overvalues:
    • FTAI’s pro-rata share of its funds’ EBITDA. That EBITDA services fund-level debt FTAI does not carry, and FTAI receives only distributions.
    • Gains on a leasing book that is running off.
    • Insurance recoveries.
  • Its core asset base (CFM56/V2500 engines) has a finite life. A forward multiple treats both the EBITDA and the asset base as if they persisted. The DCF does not.

3. What FTAI is and how it makes money #

FTAI is now three businesses with very different evidence behind them.

Aerospace Products (AP) Aviation Leasing & Strategic Capital (SCI) FTAI Power
What it does Buys run-out CFM56-5B/-7B and V2500 engines, refurbishes and sells or exchanges modules and engines (“Module Factory”); MRE contracts Owns and leases a shrinking fleet; sells assets into, services and co-invests ~19% in SCI funds Converts CFM56 cores into ~25 MW “Mod-1” turbines; sells the turbine to J&F (Jereh-controlled JV), which packages and sells gensets
2025 revenue / Adj. EBITDA $1,936M / $671M (34.7%) $571M / $609M none yet; R&D inside Corporate
H1’26 revenue / Adj. EBITDA $1,619M / $472M (29.2%) $165M / $241M ~$50M of R&D cost (est.)
2027 guidance ~$1.4B ~$450M $450M (low end of $450–750M)
What drives it Modules x revenue per module x margin; feedstock cost; share gains SCI capital raised, AUM, fees, gains, pro-rata EBITDA Turbines x transfer price − cost + JV share; policy; one customer
Base-case Adjusted EBITDA by segment. FY2026 = H1 actual + H2E; Power R&D sat inside Corporate in H1'26.
Base-case Adjusted EBITDA by segment. FY2026 = H1 actual + H2E; Power R&D sat inside Corporate in H1'26.
Quarterly Adjusted EBITDA by segment: actuals to Q2'26 and our base case to Q4'27. The 2027 step-up depends on Power deliveries and module growth.
Quarterly Adjusted EBITDA by segment: actuals to Q2'26 and our base case to Q4'27. The 2027 step-up depends on Power deliveries and module growth.

Balance sheet (30 Jun 2026):

  • Debt and liquidity. Senior notes $3.50B at face (5.50% 2028s; 7.875% 2030s; 7.00% 2031s/2032s; 5.875% 2033s). Cash $337M; revolver $2.025B, undrawn.
  • Leverage and rating. Net debt / LTM Adj. EBITDA 2.65x; Moody’s Ba1.
  • Book equity is only $404M ($3.94 a share), after years of dividends above earnings and a $300M fee to internalise management from Fortress in 2024.
  • Dividend $0.50 a quarter, raised four quarters running.
FTAI vs the S&P 500 since June: down about a third while the market rose. Chart from the earlier FTAI stock report.
FTAI vs the S&P 500 since June: down about a third while the market rose. Chart from the earlier FTAI stock report.

4. Where we differ from the Street #

Adjusted EBITDA: our base vs Jefferies vs consensus.
Adjusted EBITDA: our base vs Jefferies vs consensus.
2027E Adj. EBITDA, $M Our base Jefferies Barclays Management Main reason we differ
Aerospace Products 1,373 1,400 1,407 ~1,400 Similar 2027; we grow modules more slowly after 2027 (1,700 vs ~1,950 in 2028)
FTAI Power 214 450 450 450 45 vs ~60 turbines; Power opex inside the segment; J&F income lagged a quarter
Leasing & SCI 430 480 451 450 Fleet run-off; insurance and gains fade
Corporate, R&D, eliminations −106 −278 −170 n/a Jefferies includes Power R&D here; we put it in Power
Total 1,912 2,053 2,139 2,300 (segments) Consensus 2,181
Adjusted EBITDA by scenario against consensus.
Adjusted EBITDA by scenario against consensus.

Where we differ:

  • 2026: no disagreement. Our $1,290M is within 3% of consensus ($1,322M).
  • 2027: Power and leasing. We have 45 turbines, not ~60. We charge the Power R&D run-rate (~$90M) to the Power segment. FTAI’s share of J&F’s margin arrives a quarter after the turbine sale.
  • 2028 onward: volume. We do not model 25% market share. Our modules grow 1,500 → 1,700 → 1,850 (2027–30), against the Street’s ~1,850–2,000 by 2028. Power holds at 70–80 turbines a year rather than scaling past 100.
  • Cash: the biggest disagreement.
    • Nobody publishes a cash forecast that reconciles to GAAP.
    • FTAI’s “adjusted FCF” ($878M guided for 2026, $255M in H1) adds asset-sale proceeds.
    • Our H2’26 levered FCF (CFO + CFI) is $182M, against the ~$620M the guide implies. Closing that gap needs more asset sales into the SCI funds, which are finite, or an inventory release, which is not visible yet.

5. Aerospace Products: the growth is real; its quality and durability are the question #

5.1 Demand: an older fleet that flies less but costs more to keep flying #

US narrowbody block hours by engine family, trailing 12 months (BTS T-100, US carriers). The MAX is taking hours from the NG.
US narrowbody block hours by engine family, trailing 12 months (BTS T-100, US carriers). The MAX is taking hours from the NG.
CFM56/V2500-powered share of US narrowbody block hours: 96.8% in 2019, 64.2% in June 2026.
CFM56/V2500-powered share of US narrowbody block hours: 96.8% in 2019, 64.2% in June 2026.
  • Hours are falling, and faster.
    • US 737NG block hours −6.5% y/y in H1’26 and A320ceo −7.5% (June −10.6%).
    • Aircraft in service: 737NG −2.7% and A320ceo −5.2% y/y (Q2’26, BTS Form 41 P-5.2).
    • Jet fuel at $4.37/gal (Sep-26, +109% y/y) punishes the thirstier ceo/NG fleet.
  • Dollars are rising.
    • US carriers’ outside engine-repair spend on these fleets rose 18% y/y in H1’26.
    • 737NG engine maintenance cost per airborne hour was $422, against $235 in 2019.
    • The fleet is ageing into heavier shop visits. This is why FTAI’s 2026 volumes are well supported.
  • Shop visits have peaked.
    • GE and Safran guide CFM56 visits at ~2,300–2,400 a year to 2027–28, with Safran expecting declines from 2029. V2500 is just over 800 a year.
    • Retirements are low (GE: 1.5–2% in 2026). That keeps visits up but makes feedstock dear.
  • The replacement engines are getting fixed. GTF groundings are past their peak, and the LEAP-1B durability kit was certified in Jul-26. Both reduce the need to keep old aircraft flying in 2027–28.
US 737NG + A320ceo: engine repair spend vs airborne hours (trailing four quarters, 2019 = 100). The pool still grows on price and age, not on flying.
US 737NG + A320ceo: engine repair spend vs airborne hours (trailing four quarters, 2019 = 100). The pool still grows on price and age, not on flying.
US engine maintenance cost per airborne hour by family (BTS Form 41 P-5.2).
US engine maintenance cost per airborne hour by family (BTS Form 41 P-5.2).
FTAI Aerospace revenue vs the US CFM56/V2500 repair pool, both indexed to Q4'23 = 100. FTAI is up ~6x; the pool is up ~16%.
FTAI Aerospace revenue vs the US CFM56/V2500 repair pool, both indexed to Q4'23 = 100. FTAI is up ~6x; the pool is up ~16%.
  • Modules and share.
    • Modules: 757 (FY25) → 270 (Q1’26) → 296 (Q2’26); ~1,180–1,200 is on track for 2026.
    • FTAI claims ~14% share, with 25% as its goal. Excluding sales to its own SCI fund, the revenue-based share is ~11%. On modules (≈3 per shop visit), the Q2’26 run-rate is 12–13% of CFM56 + V2500 visits.
    • The 25% goal needs ~2,360 modules a year in a flat market. Management’s 2027 goal is 1,700.
  • Related-party revenue.
    • “MRE contract revenue” — engines and modules sold mostly to the 2025 Partnership (SCI I), which FTAI services and ~19–20% owns — was $335.8M in 2025 (17% of AP) and $404.0M in H1’26 (25%).
    • Segment EBITDA keeps 100% of the margin; only FTAI’s share is eliminated.
  • Capacity.
    • Hiring is accelerating modestly: 103 open postings on 3 October, ~14–17 new requisitions a month in the US.
    • Partner shops have been added (GMF Indonesia, now a five-year deal; EgyptAir).
    • Satellite imagery shows a new building next to the Montreal plant (May-23 → May-25; ownership not established). Every latest capture predates the 2026 ramp.
AP revenue by line: the orange layer is MRE contract revenue, sold mostly to the SCI fund FTAI manages.
AP revenue by line: the orange layer is MRE contract revenue, sold mostly to the SCI fund FTAI manages.

5.3 Unit economics: price up, cost up faster #

Per module: revenue rose ~20% from Q4'25 to Q2'26, cost per module ~29%. EBITDA per module is flat at ~$0.84M.
Per module: revenue rose ~20% from Q4'25 to Q2'26, cost per module ~29%. EBITDA per module is flat at ~$0.84M.
AP gross and EBITDA margins: actual to Q2'26 and base case (dashed). The 40% target set in Feb-26 was withdrawn in Jul-26.
AP gross and EBITDA margins: actual to Q2'26 and base case (dashed). The 40% target set in Feb-26 was withdrawn in Jul-26.

Why the margin fell:

  • Heavier workscopes, according to management.
  • Feedstock bought at market prices, replacing low-basis engines transferred from the leasing book. This is the mechanism Muddy Waters highlighted in 2025.
  • Pricing for share.

The industry pricing umbrella is rising (+24% y/y per flight hour on the 737NG), so FTAI is not capturing it. Our base holds ~30% (“around 30% for 1–2 years”, Jul-26 call). The bear case lets it slide to 26% by 2030.

Montreal module factory, May 2023 vs May 2025 (Esri World Imagery Wayback). The main building is unchanged; a new building appears to the south-west, parcel ownership not established.
Montreal module factory, May 2023 vs May 2025 (Esri World Imagery Wayback). The main building is unchanged; a new building appears to the south-west, parcel ownership not established.

6. FTAI Power: real demand, an unproven product, and economics FTAI does not control #

6.1 What is established #

  • Product.
    • Mod-1: a ~25 MW aeroderivative turbine built on a remanufactured CFM56 core, launched on 30 Dec 2025.
    • Tested in Montreal from January to May 2026, then on a genset in Miami.
    • No full-load, heat-rate or NOx data have been published, and there is no SCR at launch.
  • Structure.
    • FTAI sells the turbine to J&F Power Systems LLC, which Jereh (002353.SZ) calls its controlled subsidiary and consolidates.
    • J&F packages the genset (Jereh supplies generator, gearbox, trailer and controls) and sells it.
    • FTAI books turbine revenue on sale to J&F, and equity income later, when J&F sells.
  • The order.
    • $1.465B of gensets for an undisclosed “international cloud service provider”, equal to 61% of Jereh’s 2025 revenue.
    • Five-year master supply agreement; deliveries in batches before Nov-2027; advance received by 13 Aug.
    • Terms: price cuts of up to 10% for low output; delay damages capped at 10%; final payment after commissioning.
    • The customer had already bought $254.8M of Jereh gensets since Nov-2025, before the JV existed.
  • Disclosure.
    • Neither the order nor the JV appears in FTAI’s 10-Q, and there was no 8-K.
    • The Q2’26 10-Q was filed nine days after the order and does not mention Jereh, J&F or the order.
  • Guidance. $450M of 2027 Power EBITDA, the low end of a $450–750M range. The guide assumes “materially less” than 100 units. First delivery has moved from “by Q4 2026” (Feb) to “conservative to expect 2027” (Jul).

6.2 Unit economics and the 2027 range #

FTAI Power economics per 25 MW turbine, 2027 base. Every input is an estimate; none is disclosed.
FTAI Power economics per 25 MW turbine, 2027 base. Every input is an estimate; none is disclosed.
2027 FTAI Power Power study base This memo’s base Why
Units in the $1.465B order 60 ~59 (not modelled separately) Undisclosed by FTAI and Jereh
Turbines FTAI sells in 2027 61 (51 order + 10 other) 45 Delivery language has slipped; no observable 100-unit line
FTAI turbine price $14.65M (60% of $24.4M package) $12.0M (49%) Jereh supplies generator, gearbox, trailer and controls
FTAI cost per turbine $8.0M $6.3M (feedstock $3.0M + conversion $3.3M) Both are estimates; nothing disclosed
FTAI share of J&F margin 37.5% (~$1.2M/unit) $1.5M/unit, lagged one quarter Jefferies: FTAI books 25–50% of JV economics
Power opex charged to the segment $40M $90M Corporate opex rose ~$30M a quarter with Power R&D
2027 Power Adj. EBITDA $440M $214M Mgmt guide $450M; range in both studies runs from a loss to $0.9–1.3B

The two independent studies agree on per-unit economics: ~$7–8M of EBITDA per turbine, close to the ~$7.5M that $450M ÷ 60 implies. They disagree on volume and opex. Both questions get answered within months: the unit count (if disclosed), the first commissioning, and the delivery cadence.

2027 FTAI Power Adjusted EBITDA: the honest range runs from a loss to $0.9–1.3B.
2027 FTAI Power Adjusted EBITDA: the honest range runs from a loss to $0.9–1.3B.

What $450M requires, at our per-unit economics:

  • ~76 units in 2027; or
  • $12M of EBITDA per unit at 45 units; or
  • a ~$16.8M transfer price, ~69% of the implied genset price.

The Power study shows the same tension a second way. At margins “in line with Aerospace” (30–40%), $450M needs ~77–88 units unless the turbine captures 70–80% of the package value. None of this is contradicted, and none of it is supported by disclosed data.

6.3 The market: demand is not the problem, technology choice and policy are #

US data-center projects by status (sample of 85 US projects, 55 GW).
US data-center projects by status (sample of 85 US projects, 55 GW).
Verified behind-the-meter capacity by technology: buyers chose reciprocating engines and fuel cells more often than new aeroderivatives.
Verified behind-the-meter capacity by technology: buyers chose reciprocating engines and fuel cells more often than new aeroderivatives.
  • Demand.
    • LBNL: US data-center electricity 192 TWh (2024) → 464 TWh (2028) → 649 TWh (2030), needing ~148 GW of interconnection by 2030.
    • ERCOT’s large-load queue is ~474 GW against 5.9 GW energised, and ERCOT paused energisation of ≥75 MW data centers pending an audit.
    • PJM capacity auctions clear at the cap ($325–333/MW-day), 6.5–6.8 GW short.
    • Our central estimate is ~28 GW (range 15–50) of data-center demand that cannot get grid power on time in 2026–28.
  • Choice.
    • Named AI buyers took ~10.7 GW of reciprocating engines and ~3.3 GW of fuel cells, against ~2.7 GW of new aeroderivatives.
    • Nebius switched to fuel cells for permitting.
    • Crusoe cancelled Boom’s 1.21 GW aero-derived order and kept GE LM2500XPRESS units, used as backup where the grid is primary.
  • Economics for the customer.
    • Onsite LCOE is ~6.6–8.5¢/kWh at $3–5 gas, cheaper than PJM industrial tariffs (9–10.5¢, up 7–26% y/y). It is not cheaper than Texas, Louisiana or Oklahoma (6.4–6.7¢), where the case is speed.
    • A year of grid delay forgoes ~$1.7M of colocation lease revenue per MW (Applied Digital lease terms), many times any onsite cost premium: time-to-power is the engine of the whole category.
  • Policy.
    • EO 14421 (26 Aug) lists “generation turbines”; anything not made or assembled in the US is foreign-produced, and the order applies notwithstanding existing contracts.
    • A Chinese newspaper reports North American modules being assembled in Yantai.
    • DOE’s RFI comments are due 9 Oct; rules ~24 Dec. Jereh and Barclays expect behind-the-meter units to be exempt. That is unresolved, not excluded.
  • Permits. Uncontrolled, one 25 MW unit emits ~92 t/yr of NOx, so about three units cross the 250 t/yr major-source threshold (counted site-wide).

6.4 Production and units #

  • No independent evidence of a 100-turbine line.
    • 7 explicit Power job postings.
    • No permits, leases or test-cell additions found.
    • Jereh’s recent Houston imports are 1–20 t each, none turbine-sized.
  • The packager is stretched. Jereh is absorbing >$3.1B of data-center genset orders, ~129% of its 2025 revenue, with no visible dedicated capex.
  • Slippage has already happened before series production.
Turbines sold to the J&F JV by scenario. Management planned 100 units for 2027; the order implies 50–70 (undisclosed).
Turbines sold to the J&F JV by scenario. Management planned 100 units for 2027; the order implies 50–70 (undisclosed).
Reverse DCF: base-case value per share against Power turbines a year. Holding everything else at base, $167 needs ~2.5x our turbine path.
Reverse DCF: base-case value per share against Power turbines a year. Holding everything else at base, $167 needs ~2.5x our turbine path.

7. Aviation Leasing and Strategic Capital: from rent to gains and fund economics #

Leasing equipment, net: actual and base-case roll-forward (purchases − D&A − book value sold). The book that funds asset sales keeps shrinking.
Leasing equipment, net: actual and base-case roll-forward (purchases − D&A − book value sold). The book that funds asset sales keeps shrinking.
  • Running off by design.
    • Engines fell from 312 to 176 and aircraft from 109 to 22 (YE24 → Jun-26).
    • Lease income was $27.8M in Q2’26, against $62.4M a year earlier.
    • Leasing EBITDA exceeded segment revenue in 2025, because it includes:
      • gains on sales to the 2025 Partnership ($46M in 2025);
      • Russia insurance recoveries ($54M in 2025; $50M in H1’26);
      • FTAI’s pro-rata share of SCI EBITDA.
  • SCI is the growth leg.
    • SCI I: ~$2.0B of equity and >300 aircraft closed or under LOI.
    • The 2026 SPV has a $2.0B warehouse facility (Aug-26). FTAI commits ~15–19% of each vehicle’s equity, and executives hold carried interest.
    • On 28 Sep FTAI bought 27 WestJet 737-700s: 17 go to the 2026 SPV on sale-leaseback, and 10 become AP feedstock.
  • Guidance and our case. 2026 was cut from $575M to $475M (Jefferies $446M). 2027 is $450M. Our base is $455M / $430M.
  • What we flex. Fees, gains, income and distributions are the cash-relevant parts. In our model the pro-rata EBITDA is not cash. Flexing SCI economics ±25% moves value only ±$5 a share.
FTAI's owned leasing fleet (aircraft and engines), from the 10-K/10-Q roll-forwards.
FTAI's owned leasing fleet (aircraft and engines), from the 10-K/10-Q roll-forwards.

8. Earnings quality and cash flow #

Adjusted EBITDA vs GAAP operating cash flow vs unlevered FCF. Forecast years are our base case.
Adjusted EBITDA vs GAAP operating cash flow vs unlevered FCF. Forecast years are our base case.

Four facts the bull case must explain:

  1. Operating cash flow has been negative while EBITDA grew.
    • CFO was −$188M (2024), −$311M (2025) and −$265M (H1’26).
    • Inventory went from $551M to $1,545M in 18 months.
    • Engine and aircraft inventory purchases inside CFO were $325M (2025) and $357M (H1’26).
  2. Asset sales filled the gap.
    • Investing inflows that contain inventory components were $1,059M (2025) and $538M (H1’26).
    • The SEC reviewed FTAI’s cash-flow classification (closed Jan-2025) and accepted it. The classification is still FTAI’s choice, and it shapes every cash KPI.
  3. Gains are a large share of EBITDA.
    • The cash-flow add-back for gains on assets sold equalled 44% of Adj. EBITDA in 2024, 36% in 2025 and 32% in H1’26.
    • As the leasing book shrinks, either those gains fall or they must be replaced by margin on purchased feedstock.
  4. Company “free cash flow” adds asset-sale proceeds. Dividends were raised on “strong FCF” in quarters when GAAP CFO was +$5M, −$179M and −$160M.
Gains on assets sold (cash-flow add-back) vs Adjusted EBITDA, by quarter; the label is the ratio.
Gains on assets sold (cash-flow add-back) vs Adjusted EBITDA, by quarter; the label is the ratio.
Inventory: actual and base case (light bars). Each 10 days of inventory is ~$90M of 2027 cash.
Inventory: actual and base case (light bars). Each 10 days of inventory is ~$90M of 2027 cash.
2027E base case: how $1.9B of Adjusted EBITDA becomes ~$0.7B of unlevered FCF after stock comp.
2027E base case: how $1.9B of Adjusted EBITDA becomes ~$0.7B of unlevered FCF after stock comp.

What looks clean (balance matters):

  • Unqualified audits: EY to FY24, KPMG FY25, with ICFR effective. The auditor change in Jun-25 reported no disagreements.
  • The SEC review closed without restatement.
  • The audit committee’s forensic review found the Jan-2025 Muddy Waters allegations without merit.
  • DSO is low (16 days).
  • AP growth has continued for six quarters after the short report.

What remains unresolved:

  • Muddy Waters’ Iran report (Mar-2025): no OFAC or DOJ action found.
  • Shannahan v. FTAI (S.D.N.Y.): motion to dismiss pending.
  • The “over 1,000 engines” feedstock claim does not reconcile with 176 leasing engines plus an undisclosed inventory count.

9. Management credibility: claim audit #

# Claim (date) Status Independent evidence
C01 Mod-1 delivered by Q4-26 (Feb-26) UNVERIFIED, slipping Feb → Apr → Jul wording softened; Jereh: deliveries in 2027
C02 100 units in 2027 UNVERIFIED Guide assumes “materially less”; 7 Power postings; no capacity evidence
C03 “$1.465B customer contract” PARTIALLY SUPPORTED Order exists (Jereh 2026-048); seller is J&F, Jereh-controlled
C04 $450M 2027 Power EBITDA UNVERIFIED Our base $214M; Power study $440M; needs ~76 units at our unit economics
C05 2027 “mostly sold out” (Apr-26) UNVERIFIED One order by October
C06 25 MW, competitive efficiency UNVERIFIED No public test data; ≤10% price-cut clause
C07 EO 14421 won’t apply (behind the meter) UNVERIFIED EO lists turbines; assembly test; DOE rules ~Dec
C08 AP margin to 40% in 2026 (Feb-26) CONTRADICTED 29.2% H1’26; now “around 30%”
C09 ~1,200 modules in 2026 PARTIALLY SUPPORTED H1 566; Q3 est. ~305
C10 ~1,700 modules in 2027 UNVERIFIED Flat shop-visit market; moderate hiring
C11 14% share → 25% UNVERIFIED ~11% ex-SCI; 25% needs ~2,360 modules a year
C12 Robust end-market demand PARTIALLY SUPPORTED Engine $ +18% y/y; hours −6–8% y/y
C13 Retirements ~2–3% PARTIALLY SUPPORTED GE: 1.5–2%; stored 7.3%
C14 2026 Leasing $575M (Feb-26) CONTRADICTED Cut to $475M (Jul-26)
C15 Dividends backed by strong FCF PARTIALLY SUPPORTED GAAP CFO negative; cash came from asset sales
C16 Asset-light SCI shift executing SUPPORTED Roll-forward, fees, pro-rata EBITDA, warehouse
C17 MRE contract with the 2025 Partnership SUPPORTED (as disclosed) The issue is concentration and related-party pricing
C18 “Over 1,000 engines” available UNVERIFIED 176 leasing engines; inventory count undisclosed

Guidance history. 2026 segment EBITDA went $1.40B (Feb-25) → $1.525B (Oct-25) → $1.625B (Feb-26) → $1.525B implied (Jul-26). 2026 adjusted FCF went $1.0B → $915M → $878M. The 2025 beat was real for AP. For Leasing it was helped by insurance and gains.

10. Financial projections #

10.1 How the model works #

Structure. Our projection is quarterly from Q3’26 to Q4’30, in the column order of our CapIQ-based Excel model. It is built from a quarterly driver grid.

  • Aerospace: modules x revenue per module x margin.
  • Power: turbines x transfer price − (feedstock + conversion) + J&F income, lagged a quarter, − Power opex.
  • Leasing: GAAP lease, maintenance, asset-sale and fee lines, plus a Leasing Adj. EBITDA input. The difference is FTAI’s non-cash share of fund EBITDA.
  • Corporate: opex, G&A and stock comp.
  • Balance sheet: inventory on AP COGS days plus Power working capital; receivables on DSO; payables on DPO. The leasing equipment roll-forward drives D&A and the gains on sale.

Cash flow.

  • CFO = net income + D&A − gains on sale − equity income + distributions + stock comp − working-capital build.
  • CFI = −(leasing capex + deposits + PP&E + Power tooling) + sale proceeds − SCI co-investment.
  • Unlevered FCF = CFO + after-tax interest + CFI, less stock comp for valuation.

After 2030.

  • A 2031–35 fade:
    • AP EBITDA −2% a year in the base, as the CFM56 visit decline outweighs share gains;
    • Power flat;
    • Leasing & SCI +2%.
  • Cash conversion is held at the 2030 level, with fund co-investment normalised to growth needs.
  • Then a Gordon terminal value at 0% growth in the base.
Driver Bear Base Bull Street
Modules produced 2027 / 2030 1,350 / 1,400 1,500 / 1,850 1,700 / 2,150 1,530 / 2,100
Revenue per module 2027 / 2030 ($M) 2.95 / 3.05 3.05 / 3.25 3.20 / 3.70 3.05 / 3.25
AP EBITDA margin 2027 / 2030 28.0% / 26.0% 30.0% / 30.0% 32.0% / 32.0% 30.0% / 31.0%
Turbines sold to J&F 2027 / 2030 15 / 30 45 / 80 75 / 160 60 / 120
Power Adj. EBITDA 2027 / 2030 ($M) −118 / −45 214 / 368 900 / 1,764 449 / 937
Leasing & SCI Adj. EBITDA 2027 / 2030 ($M) 360 / 380 430 / 480 480 / 600 470 / 530
Inventory, year-end 2027 / 2030 ($M) 2,116 / 2,138 2,178 / 2,556 2,425 / 3,052 2,276 / 2,951
2031–35 fade: AP / Power / Leasing (a year) −5% / exit / 0% −2% / 0% / +2% +1% / +5% / +4% 0% / +2% / +3%
Terminal growth after 2035 −1% 0% +2% +1%

10.2 Base case: annual #

$M 2025A 2026E 2027E 2028E 2029E 2030E
Modules produced 757 1,180 1,500 1,700 1,800 1,850
Aerospace Products revenue 1,936 3,458 4,577 5,322 5,760 6,013
Aerospace Products Adj. EBITDA 671 1,023 1,373 1,623 1,757 1,804
FTAI Power revenue 0 36 540 819 912 880
FTAI Power Adj. EBITDA 0 −44 214 385 415 368
Leasing & SCI Adj. EBITDA 609 455 430 445 465 480
Corporate & eliminations −89 −144 −106 −115 −115 −115
Total Adjusted EBITDA 1,191 1,290 1,912 2,338 2,522 2,537
Total revenue (CapIQ row 9) 2,507 3,796 5,387 6,403 6,931 7,152
EBITDA, GAAP basis (CapIQ row 54) 1,002 1,045 1,636 2,002 2,156 2,159
D&A 226 178 123 104 93 87
Net income 501 583 1,121 1,476 1,616 1,617
Inventory, year-end 1,194 1,747 2,178 2,346 2,465 2,556
Leasing equipment, net, year-end 1,546 871 630 508 430 375
GAAP operating cash flow −311 −212 619 1,364 1,592 1,650
Investing cash flow 723 644 −104 −221 −254 −274
Unlevered FCF after stock comp 596 611 692 1,322 1,512 1,545

2025A from the 10-K (UFCF 2025 = CFO + after-tax interest + CFI, before stock comp). FY2026 includes H1 actuals. "EBITDA, GAAP basis" is CapIQ's measure (revenue − COGS incl. operating expenses − G&A). It excludes gains on sale to SCI, insurance, stock comp and FTAI's share of fund/JV EBITDA, which Adjusted EBITDA adds. D&A falls as the leasing book is sold.

10.3 Base case: the next six quarters #

$M Q3’26E Q4’26E Q1’27E Q2’27E Q3’27E Q4’27E
Modules 300 314 345 365 385 405
AP revenue 891 948 1,042 1,110 1,178 1,247
AP Adj. EBITDA 266 285 313 333 353 374
Turbines sold to J&F 0 3 6 10 13 16
Power Adj. EBITDA −30 −14 16 44 67 88
Leasing & SCI Adj. EBITDA 104 110 105 106 109 110
Corporate (ex-Power) −15 −15 −16 −16 −16 −16
Eliminations −9 −9 −10 −10 −10 −10
Total Adjusted EBITDA 316 358 407 456 503 546
Net income 142 178 221 263 301 337
GAAP operating cash flow 37 17 126 120 166 207
Unlevered FCF after stock comp 169 102 173 146 171 202
Q3'26 preview: our base vs Jefferies vs consensus. Consensus "Power + Corporate + elims" is implied as total − AP − Leasing; consensus components do not sum exactly.
Q3'26 preview: our base vs Jefferies vs consensus. Consensus "Power + Corporate + elims" is implied as total − AP − Leasing; consensus components do not sum exactly.

11. Valuation in detail #

11.1 Discount rate #

Input Value Basis
Risk-free rate 5.24% 10-year Treasury, 1 Oct 2026 (FRED DGS10)
Equity risk premium 4.5% Damodaran implied ERP Sep-26: 4.1% (trailing), 6.1% (smoothed)
Beta 1.31 Midpoint of bottom-up 1.05 (Damodaran industry blend) and CFRA 5-year regression 1.57
Cost of equity 11.1% CAPM
Pre-tax / after-tax cost of debt 6.75% / 5.5% Notes’ fair-value yields 5.5–6.4%; ICE BofA BB yield 7.03%; tax 18%
Weights (market): equity / debt 83% / 17% Equity $17.4B (104.0M diluted shares at $167.03); notes $3.50B at face; preferred $65M
WACC 10.2% Sensitivity 8.5–11.5% below

Beta is the biggest judgement call.

  • The bottom-up 1.05 (Damodaran industry blend) gives ~9.2%.
  • The 5-year regression beta of 1.57 gives ~11.2%.
  • We use the midpoint (1.31). The sensitivity table spans the whole range.

11.2 DCF results #

Base-case DCF bridge.
Base-case DCF bridge.
Scenario PV FCF 26H2–30 PV FCF 31–35 PV terminal EV TV share Equity Value / share vs price
Bear 2,331 2,397 2,832 7,561 37% 4,336 $42 −75%
Base 4,159 4,565 6,679 15,403 43% 12,179 $120 −28%
Bull 7,614 9,381 19,497 36,492 53% 33,268 $328 +96%
Street 5,169 6,422 11,194 22,786 49% 19,562 $193 +15%

Terminal method.

  • Our base terminal value is 43% of EV, after an explicit 2031–35 fade.
  • The earlier FTAI stock report gets $195 on the same base cash flows with an 11x exit multiple on 2030 EBITDA, and $139 with 1.5% Gordon growth at a 9.2% WACC.
  • We prefer an explicit fade plus Gordon growth. An 11x exit capitalises 2030 EBITDA as if the CFM56 business kept growing, while the OEMs expect its shop visits to fall from 2029. Our terminal value equals 7.0x 2035 Adj. EBITDA, or 8.0x on EBITDA excluding FTAI’s non-cash share of fund and JV EBITDA.
  • Even that report’s 11x-exit value (~$195, +17%) is a long way from the Street’s $310–360.

11.3 Probability weighting #

Weights bear / base / bull Value / share vs price
30/50/20 (memo) $138 −17%
25/50/25 $153 −9%
20/50/30 $167 0%
15/45/40 $192 +15%
40/45/15 $120 −28%

Why 30/50/20.

  • The bear gets more weight than the bull because:
    • the Power evidence leans later and smaller;
    • the AP margin trend is down;
    • management has already missed two 2026 guidance items.
  • The bull keeps 20% because the Power demand backdrop is real, AP volumes are growing fast, and the downside of a failed Power programme is limited to the R&D spend.
  • Even 25/50/25 leaves the expected value below the price.

11.4 Sensitivities #

Base-case value per share: WACC x terminal growth. Blue cells are above today's price.
Base-case value per share: WACC x terminal growth. Blue cells are above today's price.
Base-case value per share: Power volume x FTAI turbine price (all years).
Base-case value per share: Power volume x FTAI turbine price (all years).
Base-case value per share: AP EBITDA margin x module volume.
Base-case value per share: AP EBITDA margin x module volume.
One input at a time. The biggest single lever moves value by about ±$17; none reaches the price on its own.
One input at a time. The biggest single lever moves value by about ±$17; none reaches the price on its own.

What the grids show:

  • Across WACC 8.5–11.5% and terminal growth −2% to +2%, the base case ranges $94–$179. Only 1 of the 35 combinations exceeds the price (8.5% WACC / +2% growth).
  • Doubling Power volume at a $15M turbine price would reach $185.
  • +4 points of AP margin with +15% more modules reaches $158.

The base case needs several things to go right at once to get to the price.

11.5 Reverse DCF #

To justify $167.03, holding everything else at base… Price needs Our base Evidence
Terminal growth after 2035 4.4% 0% CFM56/V2500 installed base shrinks; OEMs see shop visits falling after 2028
WACC 7.9% 10.2% Regression beta 1.57; BB-type credit; Rf 5.24%
Power turbines a year (2028 / 2030) 177 / 202 70 / 80 One order; no observable 100-unit line; guide assumes ‘materially less’ than 100 in 2027
AP EBITDA margin (2028) 40.7% (+10.2 pts) 30.5% Margin fell from ~36% to 28.5%; 40% target withdrawn Jul-26
Modules (2028) 2,432 (1.43x) 1,700 Mgmt goal 1,700 for 2027; CFM56 shop visits flat ~2,300–2,400

11.6 Sum-of-the-parts and multiples #

Segment (base case) 2027E Adj. EBITDA Our multiples low / mid / high Barclays multiples
Aerospace Products 1,373 10x / 12x / 14x 17.5x
FTAI Power 214 6x / 10x / 16x 21.6x
Leasing & SCI 430 8x / 8.5x / 9x 8.6x
Corporate & eliminations −106 9x / 11x / 13x 16.6x
Value per share on 2027E Low multiples Mid High Barclays multiples
Bear $89 $105 $120 $146
Base $138 $173 $212 $264
Bull $217 $285 $371 $473
Street $157 $202 $255 $321
At $167.03 (EV $20.6B) 2026E 2027E 2028E
EV / Adj. EBITDA, our base 16.0x 10.8x 8.8x
EV / Adj. EBITDA, consensus 15.6x 9.4x 7.2x
EV / unlevered FCF after stock comp, our base 33.7x 29.8x 15.6x
P/E, our base 30.1x 15.6x 11.8x
EPS, our base (consensus) $5.54 ($5.98) $10.72 ($12.92) $14.13 ($18.34)
EV / 2027E EBITDA: FTAI against MRO, parts/OEM, lessor and power peers (2 Oct 2026 close).
EV / 2027E EBITDA: FTAI against MRO, parts/OEM, lessor and power peers (2 Oct 2026 close).

Reading the multiples.

  • On consensus 2027E, FTAI trades at 9.4x: in line with MRO peers (StandardAero, AAR and MTU at 9–11x), above lessors, far below parts/OEM names.
  • On our base it is 10.8x.
  • On unlevered FCF it is 29.8x 2027E and 15.6x 2028E.

The multiple looks undemanding only if the EBITDA is taken at face value. Barclays’ segment multiples on our base give $264. On consensus-like numbers they give $321, which reconciles to Barclays’ $310 target. Most of the distance between the price and the targets is the multiple, then the EBITDA. Our DCF argues against both.

12. Risks #

Risks to our short (upside for the stock):

  1. Power works:
    • an on-time first commissioning with good performance data;
    • a second customer independent of Jereh;
    • a unit count implying ≥$9M EBITDA per turbine. Our bull case ($328) is this world.
  2. DOE exempts behind-the-meter gensets, or J&F moves final assembly to the US.
  3. AP margin recovers above 32% as heavy-scope mix normalises and PMA parts ramp. Morgan Stanley’s bull case credits ~$0.8M of extra EBITDA per PMA module.
  4. SCI scales faster. The 2026 SPV’s $2.0B warehouse plus a $20B long-run AUM target lift fees and distributions.
  5. Technicals:
    • the $500M buyback executed near $167 (~3% of shares);
    • short interest 5.9% of float, 4.4 days to cover;
    • a Street that is almost all Buy and could defend the stock.
  6. A re-rating like other behind-the-meter suppliers. GE Vernova trades at ~27x and Bloom at ~48x 2027E EBITDA.

Risks that would deepen the downside:

  1. Q3/Q4 cash flow stays negative and inventory passes $1.7B.
  2. EO 14421 covers foreign-assembled behind-the-meter turbines, forcing re-sourcing or delay.
  3. CFM56 retirements jump with fuel above $4/gal, cutting future shop visits.
  4. MRE related-party share rises above 25% of AP revenue.
  5. Leverage: 2.65x net debt/EBITDA with a $1.0B 2028 maturity in a hiking rate cycle (Fed +25bp in Sep-26).
  6. Ownership concentration: Capital Group holds ~23%.

13. Catalysts and what we will monitor #

Date Event What supports our short What would challenge it
9 Oct 2026 DOE RFI comments due (EO 14421) Utilities push to cover small generators and foreign assembly Broad behind-the-meter carve-outs
Late Oct – early Nov Q3’26 results and 10-Q Adj. EBITDA < $310M; CFO negative; inventory > $1.7B; no J&F disclosure ≥ $330M; CFO positive; J&F stake and unit count disclosed
Late Oct Jereh Q3 report No new J&F advances; contract changes Second order; delivery progress
~24 Dec 2026 DOE rules under EO 14421 Turbines and assembly covered Behind-the-meter excluded
Q4’26 – Q1’27 First Mod-1 commissioning Slips past Q1’27 On time with published performance
Feb 2027 Q4’26 results and 2027 guide Power guide cut; FCF guide cut 2027 guide reaffirmed with Power disclosure
Through Nov 2027 J&F batch deliveries < 10 turbines a quarter in H1’27 ≥ 15 a quarter

KPI dashboard: thresholds that would falsify each side

KPI (source) Latest Short thesis strengthened if Short thesis broken if
AP EBITDA margin (10-Q) 28.5% (Q2’26) < 28% for two quarters ≥ 32%
Modules per quarter (calls) 296 (Q2’26) < 320 in Q4’26 ≥ 360 in Q1’27
GAAP CFO (10-Q) −$105M (Q2’26) negative for FY2026 positive two quarters in a row without asset-sale reclassification
Inventory (10-Q) $1,545M > $1.7B flat with growing revenue
MRE share of AP revenue 21% (Q2’26) > 25% < 15%
Turbines sold to J&F 0 < 10 by Q1’27 ≥ 15 a quarter in 2027
Second Power customer none none by mid-2027 independent order with disclosed economics
US NG+ceo block hours (BTS T-100) −7% / −11% y/y worse than −10% for two quarters back to flat
US engine repair $ (BTS P-5.2) +18% y/y negative y/y for two quarters > +20%
CFM56 stored share (Cirium via sell-side) 7.3% > 10% < 7%

14. Alternative-data appendix #

What we built. A re-runnable alternative-data pipeline. It collects:

  • Regulator and filing data: BTS T-100 and Form 41 (P-5.2, B-43), FTAI inline XBRL and MD&A tables, FRED, BLS and EIA.
  • Imagery and hiring: Esri Wayback imagery of seven FTAI sites; FTAI’s public ADP job boards.
  • Curated research: ~1,000 rows of CSVs with URL, dates, A–D grade and verification for every row, across Power, data centers, grid, competitors, engines, MRO and forensics.

The FTAI Power study adds:

  • a 237-item Power evidence log;
  • 61 competitor transactions;
  • a bottom-up market model and 2027 bridge.

The earlier stock report adds:

  • 2026 price history;
  • peer market data at the 2 Oct close;
  • a news timeline.

Dashboard reads (latest):

Metric Latest As of 12-month change Read
FTAI AP revenue $875M/q Q2’26 +78.5% ▲
FTAI AP EBITDA margin 28.5% Q2’26 −5.1 pt ▼
US 737NG block hours 471k/month Jun-26 −7.0% ▼
US A320ceo block hours 318k/month Jun-26 −10.6% ▼
CFM56/V2500 share of US narrowbody hours 64.2% Jun-26 −4.3 pt ▼
US NG+ceo engine outside-repair $ $670M/q Q2’26 +9.8% ▲
US 737NG engine $ per airborne hour $419 Q2’26 +23.5% ▲
Jet fuel (US Gulf) $4.37/gal Sep-26 +109% ▼ for old fleets
Henry Hub $2.95/MMBtu Sep-26 −0.9% context
10-year Treasury 5.24% 1 Oct 2026 +1.2 pt context
FTAI open postings / Power postings 103 / 7 3 Oct 2026 — baseline
US carriers: average 737NG and A320ceo aircraft in service per quarter (BTS Form 41 P-5.2).
US carriers: average 737NG and A320ceo aircraft in service per quarter (BTS Form 41 P-5.2).
Jet fuel, US Gulf Coast: $4.37/gal in September 2026, +109% y/y. The 2026 energy shock hit oil products, not natural gas (next chart).
Jet fuel, US Gulf Coast: $4.37/gal in September 2026, +109% y/y. The 2026 energy shock hit oil products, not natural gas (next chart).
Henry Hub natural gas spot price (EIA via FRED).
Henry Hub natural gas spot price (EIA via FRED).

Backtest result. We tested whether fleet-activity data lead FTAI’s reported numbers: 135 tests, year-on-year Spearman at leads of 0–4 quarters, an out-of-sample comparison against persistence, and Benjamini–Hochberg correction. Alt data cannot yet nowcast FTAI:

  • the significant correlations reflect a shared 2022–24 recovery trend;
  • they fail out of sample.

FTAI’s growth is company-specific (share, capacity, related-party sales). The market series work as risk monitors (is the pond shrinking?), not revenue predictors. We state this plainly because it limits how much the alt data can say about any single quarter.

Medley (Miami) engine test center, 2023 vs 2025: no attributable change. Imagery cannot confirm or refute 2026 production claims, because every latest capture predates the ramp.
Medley (Miami) engine test center, 2023 vs 2025: no attributable change. Imagery cannot confirm or refute 2026 production claims, because every latest capture predates the ramp.

15. Method, sources and limitations #

Primary sources:

  • FTAI FY2025 10-K and Q1/Q2’26 10-Qs and earnings releases (SEC EDGAR); FTAI calls (Motley Fool / Yahoo-Quartr transcripts).
  • Jereh SZSE announcement 2026-048 and IR records (cninfo).
  • Executive Order 14421 and the DOE RFI (Federal Register).
  • LBNL 2025 Data Center Energy Report and EIA STEO.
  • BTS T-100 and Form 41; FRED, BLS, EIA-861M.
  • ERCOT and PJM documents.
  • Esri World Imagery Wayback; FTAI ADP job boards.

Sell-side and third-party:

  • Barclays (15 Sep 2026), Jefferies (23 Sep 2026), Morgan Stanley (21 Aug 2026), CFRA quantitative report (2 Oct 2026; beta, price, range), New Constructs (17 Aug 2026), BuySellSignals (30 Sep 2026).
  • Market and peer data at the 2 Oct close, and the news timeline: stockanalysis, finviz, MarketScreener, MarketBeat, StockTitan.

Limitations:

  • Power inputs. Every Power input (units, transfer price, cost, JV share) is an analyst estimate, because nothing is disclosed.
  • Leasing EBITDA. It is an input; the fund-level economics behind FTAI’s pro-rata EBITDA are not public.
  • Scenario probabilities are judgements.
  • Data FTAI did not publish.
    • The 2023–Q3’24 module counts are not public.
    • Parts of the alternative data are snippet-grade: taken from search-result excerpts rather than full documents.
  • Blocked or paid sources. No free regression beta could be computed, so we use CFRA’s. The FAA registry, FTAI’s investor-relations site, Cirium, IBA and mba could not be accessed (blocked or paywalled).
  • Next update. The Q3’26 10-Q, due late October, will update most of the history used here.